A coating almost never fails everywhere at once. It fails at a south-west corner, along one sill, at the base of a pergola post — small, specific places where the exposure is worst. Caught early, those are an afternoon’s work. Left for three years, they are the reason the whole elevation needs stripping back.
A maintenance plan is simply a scheduled visit each year at an agreed price: we inspect, we photograph, we fix what is small, and we tell you honestly what is coming. It suits owners who are not in Spain most of the year and cannot see the property deteriorating, and it suits rental owners who need the place presentable continuously rather than in a fortnight of disruption.

How we work
Four steps, no surprises
- 01Site visitWe come out, measure up and listen to what you want.
- 02QuoteA written fixed price.
- 03The workMasking, preparation and painting — with daily clean-up.
- 04Walk-throughWe inspect every aspect of the together before signing off the project.
Recent work
Common questions
How long will the wet paint take to dry, and how strong will the fumes be inside my home?
Great questions. We are equipped with a mobile spray booth and do all our spraying outside to avoid fumes on the inside of the property.
Will the finish look completely smooth without any texture or stipple from rollers?
Yes, that is the reason for certain projects, such as doors, railings or metal gates, we choose the spray over a roller to ensure a flawless finish.
Are you using an airless sprayer or an HVLP (High Volume Low Pressure)
We are using a HVLP (high volume-low pressure).
How do you prepare a surface before painting?
We clean the surface to remove dirt, grease, or old paint, then sand and prime it to ensure proper adhesion.

